App Intel

DMS Projects

LiveDMS Global2 apps · 930 installsBusinessFreenet.dmsprojects.app

DMS Projects Matrix mobile app.

Alert me★ WatchOpen in Play ↗
Total installs
278
exact · Play shows 100+
Installs / day
—
measured after our second crawl (about a day)
Rating
—★
— ratings · — reviews
Released
17 May 2021
5.4y ago
Last update
10 Dec 2024
v1.1.3 · 1.8y ago
Countries
—
not checked yet

Install history

exact counter from Google Play
271.6328.7385.8442.950011 Oct12 Oct12 Oct
271.6328.7385.8442.950011 Oct12 Oct12 Oct

Installs per day · last 90 days

Not enough history yet — check back tomorrow

Change timeline

No changes recorded yet. We compare every crawl with the previous one and list title, icon, screenshots, description, version, price and availability changes here.

Country availability

Availability has not been checked for this app yet. “Check all countries” looks the app up in about 140 Google Play storefronts and shows where it is live, listed but not installable, or missing — plus any country-specific (custom) store listings.

Top countries

Country data will be available soon.

We estimate where downloads come from using the app’s position in Google Play’s top charts in about 140 countries. This app is not in any chart we have collected yet; the estimate appears as soon as it is.

Top chart positions

Not in any tracked top chart.

App manifest

Read this app's manifest from Google Play: permissions, declared SDKs, components and AdMob app ID. Saved analysis appears here automatically.

Manifest analysis reads only the required APK ranges. Base APK downloads may need separate device splits to install.

Data safety

declared by the developer on Google Play
  • No data shared with third parties
  • No data collected

This is the developer's own declaration, summarised from the Play listing. The permissions below show what the app is technically able to access.

Permissions

5 in 2 groups
2 Sensitive0 Notable3 Routine

What this app can do with your phone

  • Know roughly where you are, using mobile towers and Wi-Fi networks
  • Know your exact location using GPS, Wi-Fi and mobile networks
LocationSensitive2

Access to where your device is, using GPS or network signals

  • Know roughly where you are, using mobile towers and Wi-Fi networksapproximate location (network-based) · ACCESS_COARSE_LOCATION
  • Know your exact location using GPS, Wi-Fi and mobile networksprecise location (GPS and network-based) · ACCESS_FINE_LOCATION
OtherRoutine3

Access to miscellaneous device features that don't fit other categories

  • Check whether you are online and whether you use Wi-Fi or mobile dataview network connections · ACCESS_NETWORK_STATE
  • Connect to the internet to load content and send datafull network access · INTERNET
  • Make your phone vibratecontrol vibration · VIBRATE

Sensitive = can reach personal data, location, camera/mic or act on your behalf. Notable = changes how your device behaves. Routine = normal for almost every app. Source: Google Play's permission list for all versions of this app.

Store listing

Full description
A critical and essential business intelligence tool, updated daily to ensure you are constantly at the top of your commercial strategies, allowing you to maximise your returns in today's ever growing global market. Having this information at your fingertips will enable you to make informed business development decisions to give you the edge that you need in today's competitive marketplace.

Growing in Business

Category →