App Intel

ダメージ床チャレンジ|走れ飛べ金を集めーLazerfloor

Livetiritara.dev16 apps · 6K installsArcadeFree · contains adsIn-app purchases: $3.19 per itemcom.tiritara.lazerfloor

Run, jump, and dodge lasers. An exhilarating arcade game where you collect gold on a neon-lit floor.

Alert me★ WatchOpen in Play ↗
Total installs
25
exact · Play shows 10+
Installs / day
0
7-day avg · last day 0
Rating
—★
— ratings · — reviews
Released
5 Oct 2026
9d ago
Last update
6 Oct 2026
v1.1.4 · 7d ago
Countries
—
not checked yet

Install history

exact counter from Google Play
24.430.837.243.65010 Oct12 Oct13 Oct
24.430.837.243.65010 Oct12 Oct13 Oct

Installs per day · last 90 days

00.30.50.8111 Oct12 Oct13 Oct

Change timeline

Full history

No changes recorded yet. We compare every crawl with the previous one and list title, icon, screenshots, description, version, price and availability changes here.

Country availability

Availability has not been checked for this app yet. “Check all countries” looks the app up in about 140 Google Play storefronts and shows where it is live, listed but not installable, or missing — plus any country-specific (custom) store listings.

Top countries

Country data will be available soon.

We estimate where downloads come from using the app’s position in Google Play’s top charts in about 140 countries. This app is not in any chart we have collected yet; the estimate appears as soon as it is.

Top chart positions

Not in any tracked top chart.

App manifest

Read this app's manifest from Google Play: permissions, declared SDKs, components and AdMob app ID. Saved analysis appears here automatically.

Manifest analysis reads only the required APK ranges. Base APK downloads may need separate device splits to install.

Data safety

declared by the developer on Google Play
  • No data shared with third parties
  • No data collected

This is the developer's own declaration, summarised from the Play listing. The permissions below show what the app is technically able to access.

Permissions

5 in 1 group
0 Sensitive1 Notable4 Routine
OtherNotable5

Access to miscellaneous device features that don't fit other categories

  • Keep your phone's processor or screen from going to sleep, which can use more batteryprevent device from sleeping · WAKE_LOCK
  • Check whether you are online and whether you use Wi-Fi or mobile dataview network connections · ACCESS_NETWORK_STATE
  • Connect to the internet to load content and send datafull network access · INTERNET
  • Make your phone vibratecontrol vibration · VIBRATE
  • Check with Google Play that you got this app legitimatelyGoogle Play license check · com.android.vending.CHECK_LICENSE

Sensitive = can reach personal data, location, camera/mic or act on your behalf. Notable = changes how your device behaves. Routine = normal for almost every app. Source: Google Play's permission list for all versions of this app.

Store listing

Full description
赤く光る床を見極め、迫るレーザーを走って、跳んで、かわそう。 ダメージ床チャレンジ Lazerfloor(レーザーフロア)は、7×11のネオンフロアでゴールドタイルを集める、縦画面のアーケードゲームです。 左側をドラッグすると8方向にラン。右側をスワイプすると、方向と長さに合わせて最大4マスをジャンプ。移動しながらジャンプを狙える2本指操作で、交差するレーザーを切り抜けます。 遊び方 ・赤いレーザーの動きを読み、安全なタイルへ移動 ・ゴールドタイルを集めてレベルクリア ・連続で集めてコンボ倍率をアップ ・レーザーの直前をかわすクローズコールでボーナス ・3つのライフで、できるだけ高いスコアを目指す レベルが上がるにつれてレーザーの本数や速さ、進行方向の変化が増し、フロアはよりスリリングに。新しいレーザーは攻撃前にオレンジ色で予告されるため、動きを見て回避できます。 タイトル画面ではデモプレイが流れ、操作のイメージをすぐにつかめます。サウンドと振動は個別にオン・オフ可能。短時間でも遊べ、ハイスコア更新を何度でも狙えます。

Similar games

in Arcade, most installs per day first