Test Exam Preparation
🎯 Test Exam Preparation - Your Ultimate Study Companion
- Total installs
- 410
- Installs / day
- —
- Rating
- —★
- Released
- 25 May 2025
- Last update
- 31 Jul 2025
- Countries
- —
Install history
exact counter from Google PlayInstalls per day · last 90 days
Change timeline
No changes recorded yet. We compare every crawl with the previous one and list title, icon, screenshots, description, version, price and availability changes here.
Country availability
Availability has not been checked for this app yet. “Check all countries” looks the app up in about 140 Google Play storefronts and shows where it is live, listed but not installable, or missing — plus any country-specific (custom) store listings.
Top countries
We estimate where downloads come from using the app’s position in Google Play’s top charts in about 140 countries. This app is not in any chart we have collected yet; the estimate appears as soon as it is.
Top chart positions
Not in any tracked top chart.
App manifest
Read this app's manifest from Google Play: permissions, declared SDKs, components and AdMob app ID. Saved analysis appears here automatically.
Data safety
declared by the developer on Google Play- No data shared with third parties
- Collects data Personal info, Photos and videos and 2 others
- Data is not encrypted
- You can ask for your data to be deleted
This is the developer's own declaration, summarised from the Play listing. The permissions below show what the app is technically able to access.
Permissions
8 in 3 groupsWhat this app can do with your phone
- Read photos, videos, and other files saved in your phone's shared storage
- Add, change or delete photos, videos and other files in your phone's storage
Photos/Media/FilesSensitive2
Access to photos, videos, music and other files stored on your device
- Read photos, videos, and other files saved in your phone's shared storageread the contents of your USB storage ·
READ_EXTERNAL_STORAGE - Add, change or delete photos, videos and other files in your phone's storagemodify or delete the contents of your USB storage ·
WRITE_EXTERNAL_STORAGE
StorageSensitive2
Access to files, photos and media saved on your phone's storage
- Read photos, videos, and other files saved in your phone's shared storageread the contents of your USB storage ·
READ_EXTERNAL_STORAGE - Add, change or delete photos, videos and other files in your phone's storagemodify or delete the contents of your USB storage ·
WRITE_EXTERNAL_STORAGE
OtherNotable4
Access to miscellaneous device features that don't fit other categories
- Keep your phone's processor or screen from going to sleep, which can use more batteryprevent device from sleeping ·
WAKE_LOCK - Check whether you are online and whether you use Wi-Fi or mobile dataview network connections ·
ACCESS_NETWORK_STATE - Connect to the internet to load content and send datafull network access ·
INTERNET - Check with Google Play that you got this app legitimatelyGoogle Play license check ·
com.android.vending.CHECK_LICENSE
Sensitive = can reach personal data, location, camera/mic or act on your behalf. Notable = changes how your device behaves. Routine = normal for almost every app. Source: Google Play's permission list for all versions of this app.
Store listing
Full description
Growing in Education
Category →Indian Maritime UniversityYouth4work · Education—/day · 4.9K total
Vladimir Lenin ArchiveGK Apps · Education—/day · 7.7K total
Održivo gosp. otpadom u Novom XM studio · Education—/day · 40 total
Study4InsuranceEducation Griffin Media · Education—/day · 4.1K total
VM & English ClassesEducation Tree Media · Education—/day · 71 total
EduleticsAARN LMT · Education—/day · 16.5K total
GS La Vallée des SciencesBOTI SCHOOL · Education—/day · 846 total
Suara Gelatik Wingko GacorDefre Studio · Education—/day · 5.2K total