App Intel

Sams Transport

LiveSams Transport llc1 app · 152 installsAuto & VehiclesFreecom.sada.samsproject

SAMS Transport llc specializes in transportation and logistics

Alert me★ WatchOpen in Play ↗
Total installs
152
exact · Play shows 100+
Installs / day
0
7-day avg · last day 0
Rating
—★
— ratings · — reviews
Released
6 Oct 2022
4y ago
Last update
29 Nov 2024
v1.1.1 · 1.9y ago
Countries
—
not checked yet

Install history

exact counter from Google Play
148.5161.4174.2187.120010 Oct12 Oct13 Oct
148.5161.4174.2187.120010 Oct12 Oct13 Oct

Installs per day · last 90 days

00.30.50.8111 Oct12 Oct13 Oct

Change timeline

Full history

No changes recorded yet. We compare every crawl with the previous one and list title, icon, screenshots, description, version, price and availability changes here.

Country availability

Availability has not been checked for this app yet. “Check all countries” looks the app up in about 140 Google Play storefronts and shows where it is live, listed but not installable, or missing — plus any country-specific (custom) store listings.

Top countries

Country data will be available soon.

We estimate where downloads come from using the app’s position in Google Play’s top charts in about 140 countries. This app is not in any chart we have collected yet; the estimate appears as soon as it is.

Top chart positions

Not in any tracked top chart.

App manifest

Read this app's manifest from Google Play: permissions, declared SDKs, components and AdMob app ID. Saved analysis appears here automatically.

Manifest analysis reads only the required APK ranges. Base APK downloads may need separate device splits to install.

Data safety

declared by the developer on Google Play
  • No data shared with third parties
  • No data collected

This is the developer's own declaration, summarised from the Play listing. The permissions below show what the app is technically able to access.

Permissions

3 in 1 group
0 Sensitive0 Notable3 Routine
OtherRoutine3

Access to miscellaneous device features that don't fit other categories

  • Check whether you are online and whether you use Wi-Fi or mobile dataview network connections · ACCESS_NETWORK_STATE
  • Connect to the internet to load content and send datafull network access · INTERNET
  • Read Google service settings stored on your deviceread Google service configuration · com.google.android.providers.gsf.permission.READ_GSERVICES

Sensitive = can reach personal data, location, camera/mic or act on your behalf. Notable = changes how your device behaves. Routine = normal for almost every app. Source: Google Play's permission list for all versions of this app.

Store listing

Full description
Established in 2015, Sam’s Transport LLC have proven to be one of the most leading companies to provide prompt, reliable, and cost-efficient services in the fields of logistic support and transport services to its partners . Sam's Transport LLC application is an electronic transport services platform to connect customers with the drivers in no time and at a lower cost within the Middle East. The application enjoys the easy registration process without complications. The customer presents the goods and sets the starting point and the place of arrival. The driver can send his appropriate offer according to each shipment. Then, the best offer for the customer will be selected and approved. This application helps customers to easily find drivers to transport their goods in a safe manner. It also provides drivers with a wider spread and faster access to customers by presenting the modern technologies in order to reach the largest possible number of delivery requests offered by customers, increasing their profits through transporting without the need to wait for long times in the car and parking lots. It also allows drivers to reduce empty/free return trips and have an endless database of freight opportunities and better opportunities to overcome the volatile nature of the transportation market.

Similar apps

closest title first, then most installs per day