Smart Student

LiveHarmonyES CO.,LTD7 apps · 1.4K installsEducationFreecom.haihoaes.smsproject

Student Management

Alert me★ WatchOpen in Play ↗
Total installs
3
exact · Play shows 1+
Installs / day
0
7-day avg · last day 0
Rating
—★
— ratings · — reviews
Released
12 Jul 2023
3.3y ago
Last update
12 Jul 2023
v1.0.0 · 3.3y ago
Countries
1/30
live · checked 2d ago

Installs per day

gain of the exact counter
01234511 Oct13 Oct14 Oct

Daily tracking since 10 Oct 2026 · history grows every day

Install history

exact counter from Google Play
23410 Oct12 Oct14 Oct
01234512 Jul 202310 Oct 202614 Oct 2026

Dashed: estimate from the release date (no daily data before 10 Oct 2026) · time axis compressed before that day

Daily tracking since 10 Oct 2026 · history grows every day

Change timeline

1 changesFull history
  1. Content rating
    EveryoneRated for 3+

Country availability

Live 1Listed, not installable 29Not listed 0
United Arab Emirates
Argentina
Australia
Bangladesh
Brazil
Canada
Colombia
Germany
Egypt
Spain
France
United Kingdom
Indonesia
India
Italy
Japan
Kenya
South Korea
Mexico
Nigeria
Philippines
Pakistan
Poland
Russia
Saudi Arabia
Thailand
Türkiye
United States
Vietnam
South Africa

Top countries

Country data will be available soon.

We estimate where downloads come from using the app’s position in Google Play’s top charts in about 140 countries. This app is not in any chart we have collected yet; the estimate appears as soon as it is.

Top chart positions

Not in any tracked top chart.

App manifest

Read this app's manifest from Google Play: permissions, declared SDKs, components and AdMob app ID. Saved analysis appears here automatically.

Manifest analysis reads only the required APK ranges. Base APK downloads may need separate device splits to install.

Data safety

declared by the developer on Google Play
  • No data shared with third parties
  • No data collected

This is the developer's own declaration, summarised from the Play listing. The permissions below show what the app is technically able to access.

Permissions

11 in 3 groups
5 Sensitive2 Notable4 Routine

What this app can do with your phone

  • Read photos, videos, and other files saved in your phone's shared storage
  • Add, change or delete photos, videos and other files in your phone's storage
  • Show its own windows or bubbles on top of other apps you are using
Photos/Media/FilesSensitive2

Access to photos, videos, music and other files stored on your device

  • Read photos, videos, and other files saved in your phone's shared storageread the contents of your USB storage · READ_EXTERNAL_STORAGE
  • Add, change or delete photos, videos and other files in your phone's storagemodify or delete the contents of your USB storage · WRITE_EXTERNAL_STORAGE
StorageSensitive2

Access to files, photos and media saved on your phone's storage

  • Read photos, videos, and other files saved in your phone's shared storageread the contents of your USB storage · READ_EXTERNAL_STORAGE
  • Add, change or delete photos, videos and other files in your phone's storagemodify or delete the contents of your USB storage · WRITE_EXTERNAL_STORAGE
OtherSensitive7

Access to miscellaneous device features that don't fit other categories

  • Show its own windows or bubbles on top of other apps you are usingdraw over other apps · SYSTEM_ALERT_WINDOW
  • Start itself automatically as soon as your phone finishes turning onrun at startup · RECEIVE_BOOT_COMPLETED
  • Keep your phone's processor or screen from going to sleep, which can use more batteryprevent device from sleeping · WAKE_LOCK
  • Check whether you are online and whether you use Wi-Fi or mobile dataview network connections · ACCESS_NETWORK_STATE
  • Connect to the internet to load content and send datafull network access · INTERNET
  • Make your phone vibratecontrol vibration · VIBRATE
  • Receive push messages sent from the app's servers over the internetreceive data from Internet · com.google.android.c2dm.permission.RECEIVE

Sensitive = can reach personal data, location, camera/mic or act on your behalf. Notable = changes how your device behaves. Routine = normal for almost every app. Source: Google Play's permission list for all versions of this app.

Store listing

Full description
Quản lý sinh viên Quản lý thời khóa biểu cá nhân Theo dõi lịch thi và điều kiện thi Tra cứu kết quả học tập Quản lý thông tin cá nhân Trò chuyện Các dịch vụ hành chính Bảng tin, thông báo

What's new

Phát hành mới

Similar apps

closest title first, then most installs per day
More similar apps (opens in a new tab)