Gantt Chart

Live4U Mix62 apps · 859.8K installsProductivityFree · contains adscom.foryou.app.gantt.chart.excel

Present your data in a Gantt chart in Excel

Alert me★ WatchOpen in Play ↗
Total installs
2,730
exact · Play shows 1,000+
Installs / day
0
7-day avg · last day 0
Rating
—★
— ratings · — reviews
Released
4 Oct 2022
4y ago
Last update
23 Jul 2025
v7 · 1.2y ago
Countries
—
not checked yet

Installs per day

gain of the exact counter

No change in the counterOur first day-to-day reading of the counter. The line starts with the next one.

Daily tracking since 11 Oct 2026 · history grows every day

Install history

exact counter from Google Play
2,7292,7302,73111 Oct12 Oct
05001,0001,5002,0002,5003,0004 Oct 202211 Oct 202612 Oct 2026

Dashed: estimate from the release date (no daily data before 11 Oct 2026) · time axis compressed before that day

Daily tracking since 11 Oct 2026 · history grows every day

Change timeline

Full history

No changes recorded yet. We compare every crawl with the previous one and list title, icon, screenshots, description, version, price and availability changes here.

Country availability

Availability has not been checked for this app yet. “Check all countries” looks the app up in about 140 Google Play storefronts and shows where it is live, listed but not installable, or missing — plus any country-specific (custom) store listings.

Top countries

Country data will be available soon.

We estimate where downloads come from using the app’s position in Google Play’s top charts in about 140 countries. This app is not in any chart we have collected yet; the estimate appears as soon as it is.

Top chart positions

Not in any tracked top chart.

App manifest

Read this app's manifest from Google Play: permissions, declared SDKs, components and AdMob app ID. Saved analysis appears here automatically.

Manifest analysis reads only the required APK ranges. Base APK downloads may need separate device splits to install.

Data safety

declared by the developer on Google Play
  • No data shared with third parties
  • No data collected
  • Data is encrypted in transit
  • No way to ask for data deletion

This is the developer's own declaration, summarised from the Play listing. The permissions below show what the app is technically able to access.

Permissions

15 in 5 groups
6 Sensitive3 Notable6 Routine

What this app can do with your phone

  • Use your camera to take photos and record videos
  • Read photos, videos, and other files saved in your phone's shared storage
  • Add, change or delete photos, videos and other files in your phone's storage
  • Change device settings like screen brightness, ringtone or screen timeout
Photos/Media/FilesSensitive2

Access to photos, videos, music and other files stored on your device

  • Read photos, videos, and other files saved in your phone's shared storageread the contents of your USB storage · READ_EXTERNAL_STORAGE
  • Add, change or delete photos, videos and other files in your phone's storagemodify or delete the contents of your USB storage · WRITE_EXTERNAL_STORAGE
StorageSensitive2

Access to files, photos and media saved on your phone's storage

  • Read photos, videos, and other files saved in your phone's shared storageread the contents of your USB storage · READ_EXTERNAL_STORAGE
  • Add, change or delete photos, videos and other files in your phone's storagemodify or delete the contents of your USB storage · WRITE_EXTERNAL_STORAGE
CameraSensitive1

Access to your camera to take photos and record video

  • Use your camera to take photos and record videostake pictures and videos · CAMERA
Wi-Fi connection informationRoutine1

Access to details about Wi-Fi networks your device sees or uses

  • See whether Wi-Fi is on and details of the network you are connected toview Wi-Fi connections · ACCESS_WIFI_STATE
OtherSensitive9

Access to miscellaneous device features that don't fit other categories

  • Change device settings like screen brightness, ringtone or screen timeoutmodify system settings · WRITE_SETTINGS
  • See Bluetooth settings and connect to paired devices like headphones, speakers or watchespair with Bluetooth devices · BLUETOOTH
  • Start itself automatically as soon as your phone finishes turning onrun at startup · RECEIVE_BOOT_COMPLETED
  • Keep your phone's processor or screen from going to sleep, which can use more batteryprevent device from sleeping · WAKE_LOCK
  • Check whether you are online and whether you use Wi-Fi or mobile dataview network connections · ACCESS_NETWORK_STATE
  • Connect to the internet to load content and send datafull network access · INTERNET
  • Make your phone vibratecontrol vibration · VIBRATE
  • Read Google service settings stored on your deviceread Google service configuration · com.google.android.providers.gsf.permission.READ_GSERVICES
  • Receive push messages sent from the app's servers over the internetreceive data from Internet · com.google.android.c2dm.permission.RECEIVE

Sensitive = can reach personal data, location, camera/mic or act on your behalf. Notable = changes how your device behaves. Routine = normal for almost every app. Source: Google Play's permission list for all versions of this app.

Store listing

Full description
Present your data in a Gantt chart in Excel How to use: Create a Gantt chart with tasks, subtasks and milestones through ready-made templates on Excel Draw links showing dependencies between tasks through gantt chart in exsl. - View summary schedule of tasks and links. Project files can be shared on the cloud. Project Schedule brings project management and task scheduling to your android tablet or phone. Gantt Chart In Excel , Use the app to create or import business projects or schedule tasks with ready-made templates of your daily life. Simple Gantt Chart Create a project schedule and track your progress with the accessible Gantt chart template in Excel. The professional-looking Gantt chart is provided by Gantt Chart In Excel, a leading designer of Excel spreadsheets. The Excel Gantt chart template breaks down the project by stage and task, indicating who is responsible, task start and end date, and percentage completed. Share your Excel Gantt chart with the project team for collaborative review and editing. This Gantt chart template is perfect for business plans, project management, student assignments, or even a home remodel. How to make a Gantt chart in Excel If you were asked to name three key components of Microsoft Excel, what would they be? Most likely, Gantt Chart In Excel , spreadsheets to input data, formulas to perform calculations and charts to create graphical representations of various data types. I believe, every Excel user knows what a chart is and how to create it. However, one graph type remains opaque to many - the Gantt chart. This short tutorial will explain the key features of the Gantt diagram, show how to make a simple Gantt chart in Excel, where to download advanced Gantt chart templates and how to use the online Project Management Gantt Chart creator. What is a Gantt chart? The Gantt chart bears a name of Henry Gantt, an American mechanical engineer and management consultant who invented this chart as early as in the 1910s. A Gantt diagram in Excel represents projects or tasks in the form of cascading horizontal bar charts. A Gantt chart illustrates the breakdown structure of the project by showing the start and finish dates as well as various relationships between project activities, and in this way helps you track the tasks against their scheduled time or predefined milestones. How to make Gantt chart in Excel Regrettably, Microsoft Excel does not have a built-in Gantt chart template as an option. However, you can quickly create a Gantt chart in Excel by using the bar graph functionality and a bit of formatting. Please follow the below steps closely and you will make a simple Gantt chart in under 3 minutes. We will be using Excel 2010 for this Gantt chart example, but you can simulate Gantt diagrams in any Excel version in the same way. 1. Create a project table You start by entering your project's data in an Excel spreadsheet. List each task is a separate row and structure your project plan by including the Start date, End date and Duration, i.e. the number of days required to complete the tasks. 2. Make a standard Excel Bar chart based on Start date You begin making your Gantt chart in Excel by setting up a usual Stacked Bar chart. ● Select a range of your Start Dates with the column header, it's B1:B11 in our case. Be sure to select only the cells with data, and not the entire column. ● Switch to the Insert tab > Charts group and click Bar. ● Under the 2-D Bar section, click Stacked Bar. 3. Add Duration data to the chart Now you need to add one more series to your Excel Gantt chart-to-be. ● Right-click anywhere within the chart area and choose Select Data from the context menu. The Select Data Source window will open. As you can see in the screenshot below, Start Date is already added under Legend Entries (Series). And you need to add Duration there as well. ● Click the Add button to select more data (Duration) you want to plot in the Gantt chart.

Similar apps

closest title first, then most installs per day
More similar apps (opens in a new tab)