App Intel

AOM for TMA

LiveLaminaar Aviation Infotech2 apps · 41.9K installsBusinessFreecom.armsproject.aom

AOM from Laminaar Aviation Infotech is an extension of the ARMS® Suite.

Alert me★ WatchOpen in Play ↗
Total installs
59
exact · Play shows 50+
Installs / day
0
since last crawl
Rating
—★
— ratings · — reviews
Released
21 Dec 2022
3.8y ago
Last update
11 Apr 2023
v2.4.5 · 3.5y ago
Countries
—
not checked yet

Install history

exact counter from Google Play
57.668.278.889.410011 Oct12 Oct13 Oct
57.668.278.889.410011 Oct12 Oct13 Oct

Installs per day · last 90 days

00.30.50.8112 Oct13 Oct13 Oct

Change timeline

Full history

No changes recorded yet. We compare every crawl with the previous one and list title, icon, screenshots, description, version, price and availability changes here.

Country availability

Availability has not been checked for this app yet. “Check all countries” looks the app up in about 140 Google Play storefronts and shows where it is live, listed but not installable, or missing — plus any country-specific (custom) store listings.

Top countries

Country data will be available soon.

We estimate where downloads come from using the app’s position in Google Play’s top charts in about 140 countries. This app is not in any chart we have collected yet; the estimate appears as soon as it is.

Top chart positions

Not in any tracked top chart.

App manifest

Read this app's manifest from Google Play: permissions, declared SDKs, components and AdMob app ID. Saved analysis appears here automatically.

Manifest analysis reads only the required APK ranges. Base APK downloads may need separate device splits to install.

Data safety

declared by the developer on Google Play
  • No data shared with third parties
  • No data collected

This is the developer's own declaration, summarised from the Play listing. The permissions below show what the app is technically able to access.

Permissions

21 in 8 groups
11 Sensitive5 Notable5 Routine

What this app can do with your phone

  • See the list of accounts on your phone, like Google or email accounts
  • See every contact saved on your phone, including names, numbers and emails
  • Read photos, videos, and other files saved in your phone's shared storage
  • Add, change or delete photos, videos and other files in your phone's storage
  • See all events in your calendar, including details like guests, places and notes
  • Add, change or delete calendar events and email guests, without telling the calendar owner
IdentitySensitive1

Access to accounts on the device and your personal profile card

  • See the list of accounts on your phone, like Google or email accountsfind accounts on the device · GET_ACCOUNTS
CalendarSensitive2

Access to your calendar events and their details

  • See all events in your calendar, including details like guests, places and notesread calendar events plus confidential information · READ_CALENDAR
  • Add, change or delete calendar events and email guests, without telling the calendar owneradd or modify calendar events and send email to guests without owners' knowledge · WRITE_CALENDAR
ContactsSensitive2

Access to the contacts saved on your phone

  • See the list of accounts on your phone, like Google or email accountsfind accounts on the device · GET_ACCOUNTS
  • See every contact saved on your phone, including names, numbers and emailsread your contacts · READ_CONTACTS
Photos/Media/FilesSensitive2

Access to photos, videos, music and other files stored on your device

  • Read photos, videos, and other files saved in your phone's shared storageread the contents of your USB storage · READ_EXTERNAL_STORAGE
  • Add, change or delete photos, videos and other files in your phone's storagemodify or delete the contents of your USB storage · WRITE_EXTERNAL_STORAGE
StorageSensitive2

Access to files, photos and media saved on your phone's storage

  • Read photos, videos, and other files saved in your phone's shared storageread the contents of your USB storage · READ_EXTERNAL_STORAGE
  • Add, change or delete photos, videos and other files in your phone's storagemodify or delete the contents of your USB storage · WRITE_EXTERNAL_STORAGE
PhoneNotable1

Access to phone calls, call history, and voicemail

  • See your phone number, device IDs, whether a call is active, and the other caller's numberread phone status and identity · READ_PHONE_STATE
Device ID & call informationNotable1

Access to your phone's identifiers, mobile network details, and call status

  • See your phone number, device IDs, whether a call is active, and the other caller's numberread phone status and identity · READ_PHONE_STATE
OtherSensitive10

Access to miscellaneous device features that don't fit other categories

  • Get sign-in tokens for accounts saved on your phone to use online servicesuse accounts on the device · USE_CREDENTIALS
  • Open and manage documents and files from any storage provider; normally only system appsmanage document storage · MANAGE_DOCUMENTS
  • Create its own accounts on your device and read or set their passwordscreate accounts and set passwords · AUTHENTICATE_ACCOUNTS
  • Change how your phone connects to networks, like switching connections on or offchange network connectivity · CHANGE_NETWORK_STATE
  • Keep your phone's processor or screen from going to sleep, which can use more batteryprevent device from sleeping · WAKE_LOCK
  • Check whether you are online and whether you use Wi-Fi or mobile dataview network connections · ACCESS_NETWORK_STATE
  • Connect to the internet to load content and send datafull network access · INTERNET
  • Read Google service settings stored on your deviceread Google service configuration · com.google.android.providers.gsf.permission.READ_GSERVICES
  • run the application's scheduled background workGoogle Play label
  • Receive push messages sent from the app's servers over the internetreceive data from Internet · com.google.android.c2dm.permission.RECEIVE

Sensitive = can reach personal data, location, camera/mic or act on your behalf. Notable = changes how your device behaves. Routine = normal for almost every app. Source: Google Play's permission list for all versions of this app.

Store listing

Full description
The latest Mobile app from Laminaar Aviation Infotech Pvt. Ltd. is an extension of the ARMS® Suite. A state-of-the-art mobility solution that offers Airlines and Air Operators access to various Crew specific information from various sub- systems of the ARMS® Suite. Mobile app provides data to end-users in real time, as well as in offline mode. The same app can also enable the use of rapidly proliferating "Mobile Smartphone Devices" for other functions as well, e.g., for Cabin Crew, Engineering Crew, Load Masters and Ground staff etc., all controlled by a unified Backend Server infrastructure. “AOM for TMA”- comprises the Server-side components and the Mobile-side (Client) application. The other big advantage of “AOM for TMA” is that it is an integral part of the ARMS® Suite; which means it can seamlessly integrate with all the other sub-systems of ARMS® Suite thereby offering a truly integrated end-to-end Mobility solution.

What's new

Bug fixes and performance improvements.

Similar apps

closest title first, then most installs per day