App Intel

FastForward TMS Live

Pysar Developers4 apps · 62 installsProductivityFreecom.fastforwardtmsproject

Get real-time job updates, manage trips, and view payroll on the go.

Total installs
34
exact · Play shows 10+
Installs / day
—
measured after our second crawl (about a day)
Rating
—★
— ratings · — reviews
Released
20 Jun 2025
1.3y ago
Last update
25 Jul 2025
v1.4 · 1.2y ago
Countries
—
not checked yet

Install history

exact counter from Google Play
33.237.441.645.85010 Oct11 Oct11 Oct
33.237.441.645.85010 Oct11 Oct11 Oct

Installs per day · last 90 days

Not enough history yet — check back tomorrow

Change timeline

No changes recorded yet. We compare every crawl with the previous one and list title, icon, screenshots, description, version, price and availability changes here.

Country availability

Availability has not been checked for this app yet. “Check all countries” looks the app up in about 140 Google Play storefronts and shows where it is live, listed but not installable, or missing — plus any country-specific (custom) store listings.

Top countries

Country data will be available soon.

We estimate where downloads come from using the app’s position in Google Play’s top charts in about 140 countries. This app is not in any chart we have collected yet; the estimate appears as soon as it is.

Top chart positions

Not in any tracked top chart.

App manifest

Read this app's manifest from Google Play: permissions, declared SDKs, components and AdMob app ID. Saved analysis appears here automatically.

Manifest analysis reads only the required APK ranges. Base APK downloads may need separate device splits to install.

Store listing

Full description
Fast Forward TMS – Driver App is your all-in-one mobile companion designed specifically for truck drivers to streamline daily operations, reduce paperwork, and improve communication with dispatchers—right from your smartphone. Whether you're managing your assigned loads, updating statuses, uploading documents, or viewing settlements, this app puts everything you need in the palm of your hand. Key Features: Load Management: View detailed load information, pickup & delivery instructions, and assigned schedules in real-time. Status Updates: Instantly update your load status—picked up, in transit, delivered—keeping dispatch informed every step of the way. Document Uploads: Snap and upload PODs, BOLs, invoices, and other load-related documents with ease. Driver Settlements: View concise payment summaries, past settlements, and earnings transparently. Location Updates: Share real-time location with dispatch for improved tracking and routing efficiency. User-Friendly Interface: Simple, clean design built specifically for drivers to navigate quickly and easily. No more back-and-forth phone calls or lost paperwork. With Fast Forward TMS’s Driver App, you're always connected, informed, and in control. Designed for efficiency. Built for truckers. Powered by Fast Forward TMS. Download now and drive smarter.

Growing in Productivity

Category →